# Electrician bookkeeping services

## What does bookkeeping for an electrical contractor include?

Electrical contractor bookkeeping costs wire, gear, fixtures, permits and labor to each job, bills commercial work by progress with retainage tracked as its own receivable, splits service calls from project revenue, and keeps certified payroll by classification on prevailing wage jobs. Subcontractors give W-9s before the first payment, and job margins are reviewed at every monthly close.

Common for electrical contractors

- Copper went up between the bid and the rough-in, and nobody knew the job had lost its margin until it closed
- The general contractor holds 10% on three commercial jobs, and QuickBooks shows it as overdue receivables instead of retainage
- A public school job needs weekly certified payroll, and the payroll system has no way to separate hours by classification
- Service calls, panel upgrades and a tenant buildout all post to one Sales account
- Supply house bills for Graybar and a local distributor are paid from the statement total, with nothing coded to a job

In detail

## Where electrical books differ from other contractors

Bookkeeping for electricians follows the contractor pattern for most of what matters: job costing, progress billing, retainage, work in progress and subcontractor 1099s are covered in our page on [construction bookkeeping](/industries/contractors/) and in depth in [bookkeeping for contractors](/blog/bookkeeping-for-contractors/). This page covers the parts specific enough to the electrical trade to need their own treatment: material prices that move between bid and install, a service side and a project side under one roof, prevailing wage work, union fringes, and installs tied to rebates and credits that changed in 2025 and 2026.

## Service calls and project work need separate revenue

Most electrical contractors do two kinds of work. Service work (troubleshooting, panel upgrades, circuits, fixtures, generator and EV charger installs for homeowners) is priced per call or per small job and paid on completion. Project work (new construction, tenant improvements, commercial buildouts) is bid, billed monthly against a schedule of values, and paid weeks later with retainage held back.

Give each its own revenue account and keep their costs apart. A shop that blends them cannot tell whether the service vans are profitable or just keeping crews busy between project phases. With class tracking in QuickBooks Online (Plus and Advanced plans), field labor and truck costs can be split between the two as well.

## Wire and gear prices move between bid and install

Copper wire, switchgear and panels can change price materially between the day a job is bid and the day the material is bought. On a job where wire and gear are a large share of cost, that change can take most of the margin. The books catch it only if material is coded to the job when it is bought, not expensed in a lump from the supply house statement.

Two habits make the difference:

- **Enter each supply house invoice as a bill against the job**, using the job number on the counter ticket or purchase order. Distributors such as Graybar, Rexel and CED send monthly statements; tie each statement to the bills in Accounts Payable so missing invoices and unapplied returns show up.
- **Compare job cost to estimate every month**, line by line, while the job is still running. A materials line running 20% over estimate at rough-in is something to raise with the general contractor or the customer, if the contract has an escalation clause, before the job closes.

## Retainage and progress billing

On commercial work, the general contractor or owner usually withholds a share of each progress payment, commonly 5% to 10%, until the job is complete. That retainage is earned but not yet collectible, so it belongs in its own receivable, not mixed with ordinary Accounts Receivable where it looks overdue. The construction chart uses 1150 Retainage Receivable for it, and 2110 Retainage Payable to Subcontractors for what the electrical contractor in turn holds back from its own subs. The progress billing entry and the retainage release are worked through in [bookkeeping for contractors](/blog/bookkeeping-for-contractors/), and over- and under-billings on long jobs in [WIP accounting](/blog/wip-accounting/).

## Prevailing wage and certified payroll

Public work brings payroll rules most residential shops never see. The federal Davis-Bacon Act applies to contractors and subcontractors on federally funded or assisted construction contracts over $2,000 for public buildings or public works, and requires paying at least the locally prevailing wage and fringe benefits for each worker classification, with certified payrolls submitted weekly. Many states have their own prevailing wage laws for state and local projects, with their own thresholds and forms.

For the books, that means:

- **Hours by job and by classification** (electrician, apprentice at a stated level, laborer), not only by employee.
- **Fringe benefits tracked separately**, whether paid as cash in the wage or to a bona fide benefit plan.
- **A payroll setup that can produce the weekly report** for each covered job. A payroll provider that supports certified payroll, or a construction payroll add-on, is usually cheaper than building the report by hand each week.

## Union fringe contributions

A union electrical contractor remits contributions for each hour worked to several funds (pension, health and welfare, apprenticeship training and others under the collective bargaining agreement). Each fund is a liability from the moment the hours are worked until the remittance is paid, usually monthly. Give each fund its own liability account, accrue the contributions with each payroll, and clear them with the remittance report. A single Union Dues account that holds everything cannot be checked against any fund’s report, and fund auditors do check.

## Rebates and credits for generator, EV charger and solar installs

Residential electrical work increasingly comes with incentive paperwork:

- **Utility and state rebates paid to the contractor** at the point of sale reduce the customer’s invoice; the program owes the rest. Book it to a Rebates Receivable and check the balance each month, since programs pay slowly.
- **The federal EV charger credit is ending.** The alternative fuel vehicle refueling property credit (Section 30C) is not allowed for property placed in service after June 30, 2026, and the homeowner energy efficient home improvement credit (Section 25C) ended for property placed in service after December 31, 2025, both under P.L. 119-21 (the IRS [energy credit FAQs](https://www.irs.gov/newsroom/faqs-for-modification-of-sections-25c-25d-25e-30c-30d-45l-45w-and-179d-under-public-law-119-21-139-stat-72-july-4-2025-commonly-known-as-the-one-big-beautiful-bill-act-obbb) have the dates). These are the customer’s credits, but proposals and invoices that mention them should be updated.

## Electrical contractor chart of accounts

Start from a construction chart rather than a generic one; ours is in the [contractor chart of accounts](/blog/chart-of-accounts-for-contractors/), with a CSV and the [construction chart explorer](/tools/chart-of-accounts/construction/). For an electrical shop, keep these from it:

| No. | Account | Why an electrician needs it |
| --- | --- | --- |
| 1150 | Retainage Receivable | Commercial retainage held by GCs and owners |
| 1300 | Costs in Excess of Billings (Underbillings) | Long jobs billed behind the work |
| 2110 | Retainage Payable to Subcontractors | Retainage held from low-voltage or trenching subs |
| 2120 | Billings in Excess of Costs (Overbillings) | Long jobs billed ahead of the work |
| 4010 | Contract Revenue - Progress Billings | Project work against a schedule of values |
| 4020 | Change Order Revenue | Approved changes, tracked apart from base contract |
| 4030 | Time & Materials Revenue | Service calls and small T&M jobs |
| 5010 | Direct Job Materials | Wire, conduit, gear and fixtures by job |
| 5020 | Direct Field Labor | Electricians and apprentices on jobs |
| 5030 | Subcontractor Expense (1099) | Subs on a W-9 |
| 5050 | Municipal Permits & Engineering Fees | Electrical permits and inspections |

Then add the electrical-specific accounts this page describes: Service Call Revenue if you want service separated from other T&M work, Rebates Receivable, a liability per union fund if you are signatory, and Prevailing Wage Fringe Payable if you pay fringes to a plan on public jobs.

## Electrician tax deductions

An electrician filing Schedule C, or an electrical company, deducts the ordinary and necessary costs of the trade: materials used on jobs, field and office wages, vans and fuel, tools, licenses and continuing education, liability insurance and bonds, software and marketing. Vans with a gross vehicle weight rating above 6,000 pounds fall outside the passenger auto depreciation limits, and P.L. 119-21 made 100% bonus depreciation permanent for qualified property acquired after January 19, 2025 (IRS interim guidance is in Notice 2026-11); small tools of $2,500 or less per item can be expensed under the de minimis safe harbor election. Arc-rated clothing and other protective gear count as work clothing because they are not suitable for everyday wear; jeans and boots worn on site generally do not. An electrician driving a personal vehicle on the standard mileage rate should note that the 2026 business rate changed mid-year, from 72.5 cents to 76 cents a mile for driving on or after July 1, 2026, which several published deduction lists still miss; the [real estate agent deductions checklist](/blog/real-estate-agent-tax-deductions/) works through a split-year example. What to claim and when is the tax preparer’s call; the books’ job is to have every cost in the right account with its bill attached.

## What is the best accounting software for electricians?

Service-heavy shops usually pair a field service platform for dispatch and invoicing with QuickBooks Online. Project-heavy shops often add estimating and project management software, and larger ones move to a construction ERP. QuickBooks Online handles job costing (Projects, on Plus and Advanced), progress invoicing and retainage with the right accounts; the limit most electrical contractors hit first is certified payroll, which comes from the payroll system, not from the ledger.

## How much does electrical contractor bookkeeping cost?

Fixing an electrical file usually means coding a year of supply house bills to jobs, separating retainage from receivables, splitting service from project revenue, and rebuilding payroll by job where certified payroll is needed. That is a [cleanup](/quickbooks-cleanup/) engagement, scoped to the number of months affected. The [cost calculator](/tools/pricing-calculator/?months=12) totals it with the monthly fee for any number of months.

$99per month of backlog20% off 6+ months

Once the file is clean, a [monthly close](/monthly-bookkeeping/) reconciles every account and supply house statement, updates retainage and reviews job cost against estimate, closed by the 5th business day. That is $149 a month (up to 3 accounts, up to 200 transactions a month), and $199 past either limit or with class tracking. Owners can read how an engagement starts on the [outsourced bookkeeping page](/for-business-owners/). Other trades are on the [industries page](/industries/), and full pricing is on the [pricing page](/pricing/).

Or [send your file for a free review](/contact/?from=industries%2Felectricians), with a written answer within 48 hours.

Ledgerbrook

Behind on your QuickBooks books?

Cleanup or catch-up

$99 per month of backlog, 20% off 6+ months

Turnaround

5 business days for a typical year

Monthly close

From $149 a file a month

[Get a free file review](/contact/?from=industries%2Felectricians)

Free, no card, no obligation. A written answer within about 48 hours.

[Price my backlog](/tools/pricing-calculator/?months=6)[See every price](/pricing/)

[![](/_astro/omkar-moraye.BHiWb4KG_2p9N2A.webp)Omkar MorayeQuickBooks Certified ProAdvisor](/about/)

- [![Intuit QuickBooks Certification Level 1](/_astro/level-1.BokmyvzE_Z2cyGo6.webp)](https://www.credly.com/badges/7ceaf1c4-83da-4a1b-b19f-7e15cb5c0ac7/public_url "Intuit QuickBooks Certification Level 1. Verify on Credly.")
- [![Intuit QuickBooks Certification Level 2](/_astro/level-2.D-GWLUNI_Z1Sh5RD.webp)](https://www.credly.com/badges/02426568-00bb-46e1-a939-9063497c54d6/public_url "Intuit QuickBooks Certification Level 2. Verify on Credly.")
- [![Intuit Bookkeeping Certification](/_astro/bookkeeping.C82JE0Dn_Z1YzPBj.webp)](https://www.credly.com/badges/30b70ae2-e369-4a8b-9fee-d6db3a47b70c/public_url "Intuit Bookkeeping Certification. Verify on Credly.")
- [![QuickBooks Online Payroll Certification](/_astro/payroll.r5Yo2XnL_VxspM.webp)](https://www.credly.com/badges/2fc8fb7d-90d1-43ba-961b-aff161fe8491/public_url "QuickBooks Online Payroll Certification. Verify on Credly.")

Issued by Intuit, verified by Credly.

Updated October 16, 2026 · [Omkar Moraye](/about/)